Key Points
- Chiltern Railways will introduce two new Oxfordshire-to-London services on December 13, 2026.
- A limited-stop morning service will run from Oxford Parkway and Bicester Village to London Marylebone.
- A second service will provide a non-stop journey from Bicester Village to London Marylebone.
- The revised timetable will add 10,000 weekday seats and 25 weekday services across the network.
- Passengers should check revised departure and arrival times before travelling.
Oxford (Oxford Daily) November 26, 2026 – Chiltern Railways will add two new services between Oxfordshire and London Marylebone when its revised timetable begins on December 13, 2026. The changes include a limited-stop morning train from Oxford Parkway and Bicester Village, alongside a non-stop Bicester Village service. The timetable overhaul will also provide an additional 10,000 seats each weekday and follows Chiltern Railways’ first major timetable change since entering public ownership.
What new Oxfordshire trains to London have been announced?
As reported by Oxford Mail in a report published on November 26, the first new service will depart Oxford Parkway at 7.28am, call at Bicester Village at 7.38am and reach London Marylebone at 8.38am.
Oxford Mail reported that the second service will leave Bicester Village at 10.32am and arrive at London Marylebone at 11.26am without stopping. The report said there would be no significant changes at Islip station, although minor timetable adjustments would affect services elsewhere on the network.
How many seats will the timetable change add?
Oxford Mail reported on November 23 that the revised timetable will provide 10,000 additional seats every weekday, equivalent to nearly 60,000 extra seats each week. The overhaul will include 25 additional weekday services and more journeys between London Marylebone and Bicester Village.
The wider changes include two trains an hour between London and the West Midlands, a direct London Marylebone service to Stratford-upon-Avon and increased Oxford-to-London services using refurbished Class 168 trains. The modern Chiltern Explorer fleet, which entered service in January, will also support the changes.
What has Chiltern Railways said about the changes?
Tony Baxter, interim managing director of Chiltern Railways, described the December timetable as one of the company’s most significant recent improvements. He said it was designed to align services more closely with customer needs and future demand, while marking the first timetable change since the railway entered public ownership.
Chiltern Railways advised passengers to check journey information before setting out because departure and arrival times may differ from current schedules.
What is the background to the Oxfordshire rail changes?
The timetable is the largest Chiltern Railways network overhaul in more than a decade, according to Oxford Mail. It follows the introduction of the Chiltern Explorer fleet and the refurbishment of Class 168 trains for Oxford and London services. Chiltern Railways was also appointed to operate the first phase of East West Rail between Oxford and Milton Keynes. Separately, passengers have recently been advised to use Chiltern services to London Marylebone during planned disruption affecting Great Western Railway services between Oxford and London Paddington.
How could the changes affect Oxfordshire passengers travelling to London?
The new trains should give passengers in Oxford, Oxford Parkway and Bicester Village more options for reaching London Marylebone, including an earlier limited-stop journey and a non-stop late-morning service from Bicester Village. The additional weekday seats may increase capacity for commuters and other regular travellers. However, passengers will need to confirm the new timetable before travelling, particularly because minor changes will apply across the network.
